Help me plan this home renovation: [PROJECT GOALS]. The home and existing conditions are: [HOME DETAILS]. My budget, target completion date, and disruption limits are: [BUDGET AND TIMELINE]. My style preferences and non-negotiables are: [PREFERENCES]. I already know these site constraints, quotes, or building rules: [KNOWN CONSTRAINTS]. Act as an experienced residential renovation planner. Do not present yourself as an architect, engineer, inspector, or code official. Build a practical pre-bid plan rather than a mood board. Separate work that is cosmetic from work that may require design, structural, electrical, plumbing, HVAC, moisture, asbestos, lead-paint, or permit review. Produce: 1. A scoped project brief with the room-by-room work, exclusions, and decisions still open.
2. A dependency-aware sequence from investigation and design through permits, demolition, rough-ins, inspections, finishes, punch list, and final payment. Identify work that should not be ordered before field measurements or opening walls. 3. A phased budget table using ranges only, with a contingency line and separate allowances for unknown conditions, permits, design, temporary living arrangements, and owner-supplied items. State which ranges are assumptions, not quotes. 4. A contractor bid checklist that requires itemized labor and materials, allowances, change-order process, insurance, license checks, schedule, payment milestones, warranty, and cleanup. 5. A risk register covering hidden water damage, outdated wiring, supply lead times, permit delays, and scope creep, with a mitigation for each. Never invent local code requirements, prices, structural conditions, or contractor credentials. Flag any task that needs a licensed local professional or testing before work starts. Ask up to 3 clarifying questions only if a required input is missing. Before answering, check that the sequence does not place finishes before required rough-in inspections and that the budget does not treat an allowance as a fixed cost.
Fill in
| Placeholder | What to enter | Example |
|---|---|---|
| [PROJECT GOALS] | Describe the rooms, improvements, and outcome you want from the renovation. | Renovate a small galley kitchen for better storage, add dishwasher plumbing, replace worn flooring, and improve lighting. |
| [HOME DETAILS] | Give the home age, location, size, relevant systems, and visible condition issues. | 1958 two-story brick home in Raleigh, North Carolina; 1,450 square feet; kitchen is 11 by 8 feet; original cabinets, no visible leaks. |
| [BUDGET AND TIMELINE] | State your target budget, completion date, and limits on noise, occupancy, or access. | Target $38,000 including contingency; complete before May 2027; we will live in the home and need a temporary sink plan. |
| [PREFERENCES] | List preferred materials, style references, accessibility needs, and items you will not compromise on. | Warm white cabinets, durable quartz-look counter, induction-ready electrical capacity, no open shelving. |
| [KNOWN CONSTRAINTS] | Paste existing quotes, HOA rules, known defects, measurements, or permit information. | HOA requires exterior work approval. One contractor estimated $6,500 for cabinetry installation only. No permit research completed. |
How to use
- Paste the prompt with room dimensions, photos described in words, and every quote or inspection note you have.
- Check that the scope labels unknown conditions and distinguishes allowances from contractor prices.
- Use the bid checklist when requesting comparable estimates from contractors.
- Follow up with: “Turn this into a one-page bid request with a separate allowance schedule and no material substitutions without written approval.”
Variations
Kitchen bid brief
Use this before collecting kitchen contractor bids.
Create an itemized bid brief for my kitchen renovation. Existing kitchen and dimensions: [EXISTING KITCHEN]. Desired layout and appliances: [DESIRED LAYOUT]. Materials I prefer: [MATERIALS]. Budget and constraints: [BUDGET AND CONSTRAINTS]. Include demolition, protection, cabinets, counters, appliances, electrical, plumbing, ventilation, flooring, permits, inspections, cleanup, and owner-supplied items. List open decisions and field-verification items separately. Require bids to identify allowances, exclusions, change-order rates, schedule, insurance, and payment milestones. Do not estimate local code requirements or fixed prices. Ask up to 3 questions only if needed. Check that appliance specs are compatible with the proposed utilities.
Renovation phasing
Use this when you must remain in the home during work.
Plan renovation phases for these projects while I live in the house: [PROJECT LIST]. Household needs and rooms that must remain usable: [OCCUPANCY NEEDS]. Budget and deadline: [BUDGET AND DEADLINE]. Known conditions: [KNOWN CONDITIONS]. Give a phase-by-phase schedule with temporary services, dust and noise containment, shutoff windows, ordering lead times, inspections, and dependencies. Identify the least disruptive order and tasks that should be combined to avoid reopening finished work. Do not promise dates or assume permits. Flag work needing licensed or safety specialists. Ask up to 3 questions only if required. Check that every phase leaves essential access or a stated temporary alternative.
Contractor quote review
Use this after receiving one or more estimates.
Compare these renovation proposals: [PROPOSALS]. My intended scope is: [INTENDED SCOPE]. Existing conditions and priorities are: [CONDITIONS AND PRIORITIES]. Make a side-by-side matrix of included work, exclusions, allowances, material specifications, permits, schedule, payment terms, warranty, insurance, and change-order procedure. Identify apples-to-oranges differences and write neutral questions for each contractor. Do not declare a contractor qualified or invent missing inclusions. Flag any vague line item that could create scope creep. Ask up to 3 questions only if the intended scope is unclear. Check that no proposal amount is compared as equivalent when its scope differs.
Tips
- Get existing conditions documented before final pricing; concealed plumbing, wiring, or water damage is a common source of legitimate change orders.
- Ask contractors to separate allowances from fixed-price work so a low bid does not hide unfinished product selections.
- Do not order cabinets, countertops, or custom glass from preliminary measurements; field verification after demolition may change dimensions.
- Tie progress payments to completed, inspectable milestones rather than calendar dates alone.
FAQ
Can AI estimate my renovation cost?
It can create planning ranges and expose missing cost categories, but local labor, site conditions, permits, and selected materials require current local quotes.
Can this replace an architect or engineer?
No. Structural changes, building systems, permits, and safety issues need the appropriate licensed local professional.
What should I give contractors?
Give the same written scope, drawings or dimensions, allowance schedule, and decision deadlines to each bidder so estimates are comparable.